When a customer sends an RFQ for a "plastic part," the first thing I ask is which process they have in mind — because the mold design, steel selection, and cost structure can differ by an order of magnitude across the 23-odd commercial molding routes. Injection molding remains the workhorse: a hardened P20 or H13 cavity, balanced runner system, and cooling channels sized for a 20–80°C mold temperature window. Extrusion dies are a different animal altogether — no cavity-and-core geometry, just a streamlined flow channel with land length typically 15–25 times the die gap to control die swell. Blow molding pins the parison thickness tolerance to the die head gap, and a 1 mm variation there can scrap an entire HDPE bottle run.
Thermoforming and vacuum forming are where tooling budgets drop sharply — an aluminum temperature-controlled mold with vacuum holes at 0.5–1.0 mm diameter often costs a fraction of a steel injection tool, but cycle time climbs and draw ratio limits part geometry. Compression and transfer molds for thermosets need hardened inserts and generous draft (1–3°) because the material flashes easily at parting lines. Calendering rolls must be chrome-plated and internally bored for oil circulation to hold ±0.02 mm gauge on PVC sheet. Foaming — whether EPS bead molding or structural foam injection — adds a gas counter-pressure or steam chamber to the tool, and venting becomes critical to avoid surface defects.
For quoting, the rule of thumb I use: match the process to annual volume first, then let the mold material follow. A 5,000-piece run rarely justifies a multi-cavity hardened tool; a 500,000-piece program almost never survives on soft aluminum. Get the process wrong at the quotation stage and no amount of cycle-time optimization will recover the margin. For more mold sourcing and process selection references, visit MoldSo at www.moldso.com.
The tooling spec differences between processes are exactly where quotes go wrong, especially when a buyer sends an RFQ that says "plastic mold" without naming the process. We now ask for the process and resin up front before we'll commit to a tooling price.