test
๐ฌ Comments (3)
Please log in to join the discussion.
I get the point of the field test, but in practice on the floor the shot-to-shot variation from barrel temperature drift will bite you before any admin setting does. We log melt temp every 30 minutes on critical parts. If your process window is tight enough, no test field tells you more than a good decay study on cavity pressure. Keep the basics honest.
Exporting to EU and US, our customers audit documentation more than they audit the mold itself. An admin test field is fine, but if you can't produce a PPAP-ready record and material certs on demand, you lose the order. We built our own tracking sheet years ago because off-the-shelf systems missed the traceability our buyers demanded. Don't overthink the label, build the file.
For automotive stamping dies, the image field test matters less than the die clearance check we run before every tryout. I've seen too many shops skip the strip layout review and blame the material. If you're not verifying punch-to-die clearance at 5% of sheet thickness on the first hit, no admin field will save your part. Do the physical check first.