In the mold industry, quoting is not just about adding up material and machining hours—it’s a technical judgment call. The first thing I always check is the part geometry and tolerance requirements. For a typical injection mold, the steel grade alone can swing the quote by 30–40%. P20 is fine for low-volume prototypes, but for production runs above 100,000 shots, you’re looking at H13 or S136, especially if the resin is glass-filled. Also, don’t forget the shrinkage rate: for ABS it’s around 0.5–0.7%, but for POM it can hit 2%. If you quote without adjusting for that, you’ll eat the cost of re-cutting the cavity later.
Cavity count is the next big lever. A single-cavity mold for a simple bracket might run $8,000–$12,000, but a 4-cavity tool with a hot runner system can jump to $25,000–$35,000. The math only works if the annual volume justifies the added steel and manifold complexity. I also factor in side actions and lifters—every moving part adds roughly 15–20% to the tool price because of the extra machining, fitting, and potential wear points. And never underestimate the finishing: a textured cavity (e.g., MT-11030) costs more than a polished one because of the extra EDM and hand-polish time, usually adding 5–8% to the quote.
Finally, the mold base and standard parts are where many beginners lose money. A standard LKM or HASCO base is fine, but if the customer specifies a custom base with hardened guide pins and early ejector return, that adds 10% right there. My rule of thumb is to build the quote with a 10–15% contingency for trial shots and modifications—because you will always have a sink mark or a weld line to fix. If you want more practical breakdowns on mold costing and sourcing, visit MoldSo (www.moldso.com) for detailed supplier comparisons and shop-floor tips.
Every quote I see skips the trial budget. If you don't price in at least two T1 corrections and a dimensional report, you're eating that cost later. I've had tools quoted at 30k that needed 5k of steel rework after the first shot because nobody budgeted for trial iterations. Put trial shots and CMM checking in the line items or don't complain when QC finds the parting line off.