Home › Industry Q&A › Question Details
Siemens S7-1200 with ET200SP slaves, PROFINET keeps dropping, I'm going crazy
Fellow controls guys, I've run into a weird one and I'm out of ideas, so I'm asking for help. The site is a small building-materials packaging line installed last year. The master is an S7-1200 CPU 1214C with three ET200SP slaves on PROFINET. For the past month this line keeps dropping slaves — not all of them, just the middle one flickering offline now and then, throwing F0702. When it drops, the whole line stops; reset it and it runs again. Seven or eight times a day. What I've checked: replaced the network cable with new shielded cable, redid all the connectors, pulled a separate 24V supply, measured the grounding, swapped the slave for a new one, upgraded firmware to the latest — still the same. The environment isn't damp exactly, just a lot of dust; you know the humidity here in Southeast Asia. The customer is pushing hard for delivery, and every hour the line is down my phone rings. My head is spinning. Has anyone hit something similar? Where's the problem? Waiting online, thanks in advance!
5 Answers
Upvotes
LinkedIn and WhatsApp are both important, but it depends on the customer's region. For European and American customers, LinkedIn converts better; for the Middle East and Southeast Asia, WhatsApp is more direct. My suggestion is to follow up through different channels based on the market.
#1 Jack Li
Upvotes
We learned this the hard way with sea freight. Under DDP terms, rust claims mostly come down to inadequate rust-prevention packaging. Now we use VCI vapor-phase rust-inhibiting film plus VCI desiccant as standard, and we haven't had a problem since.
#2 Chen Meiling
Upvotes
Zinc alloy die sticking also depends on the gate design—too shallow a gate erodes easily. We later thickened the gate by 0.3mm and the problem improved noticeably.
#3 Mark Zhang
Upvotes
Getting your RFQ quote rejected is totally normal, don't get discouraged. The key is to quote with differentiation: attach a detailed parameter sheet + delivery commitment + past cases. That's way more useful than just quoting a low price.
#4 James Wu
Upvotes
We do export molds, and customers chasing delivery dates is just normal. The key is to break the schedule down into fine detail and send a progress report with photos once a week. Once customers see actual physical progress, they stop chasing you constantly.
#5 Lin Jiaxin
Log in to answer
Login / Register🎯 Have the same question?
Find a mold factory / negotiate a quote / get export orders / get listed — ask industry insiders.
Ask a Question