Mold Water Line Flow Meter Readings Fluctuating, Customer Pushing for Report, Urgent
Fellow experts, I need help with an injection mold trial issue that's giving me a headache. We made a set of PP material turnover box molds for a German customer, 1 mold 2 cavities, hot runner with two needle valve gates. During trial, we found that the product weight from one cavity is always about 1.5% lighter than the other, and the wall thickness is also thinner, clearly indicating insufficient filling. The mold water lines are connected to a mold temperature controller with 90Β°C water temperature. The flow meter readings for each cavity are normal, but the pressure in that cavity just won't go up. The injection molding machine is an Engel duo 350, and the holding pressure curve doesn't show any major abnormalities. We have already checked: both needle valves of the hot runner have been replaced with new ones, and the valve pin stroke has been adjusted; the temperature uniformity of the manifold was checked with a thermal imager, and the temperature difference is within 2 degrees; we also suspected venting, so we removed the cavity insert and cleaned the venting grooves. Now the customer wants to see the trial report and samples on Friday, and this problem has been dragging on for three days. The workshop is waiting for production scheduling. Has anyone encountered a similar situation? Could it be a dead spot in the hot runner or poor balance adjustment? Or is there a hidden blockage in the water line causing local overcooling? Waiting online, quite urgent, thanks in advance!
5 Answers
Upvotes
We've learned our lesson with sea freight. Under DDP terms, rust claims are mainly due to inadequate packaging for rust prevention. Now we uniformly use VCI vapor phase rust prevention film + VCI desiccant, and we haven't had any problems since.
#1 David Chen
Upvotes
In this situation, you first need to distinguish whether it's a mold problem or a machine problem. Our approach is: first measure mold temperature uniformity, then check water line flow, and only then adjust process parameters. Don't start adjusting randomly right away.
#2 Ye Jing
Upvotes
I've encountered exactly the same phenomenon. Later, we tested the holding time in stages and found that the holding pressure switch point was set unreasonably. After changing it, the problem was solved. You can give it a try.
#3 Tony Wang
Upvotes
In this situation, you first need to distinguish whether it's a mold problem or a machine problem. Our approach is: first measure mold temperature uniformity, then check water line flow, and only then adjust process parameters. Don't start adjusting randomly right away.
#4 Jack Li
Upvotes
I've encountered exactly the same phenomenon. Later, we tested the holding time in stages and found that the holding pressure switch point was set unreasonably. After changing it, the problem was solved. You can give it a try.