When a customer asks why two shops quote the same part at 30% apart, the honest answer usually isn't "one shop is greedy." Take a mold quote apart the way you'd take apart a platform's pricing strategy. A P20 or 718H cavity insert has a known per-kg cost; roughing, semi-finishing, and EDM hours are estimable; heat treatment and polishing are line items you can defend. But the quote also carries invisible entries: programming and electrode design time, trial-run shots and correction loops, fixture build, CMM inspection, and the risk buffer for a part with deep ribs or tight tolerance stacks. Shops that quote only steel and spindle time are quoting a number they can't hold. The ones that survive quote the whole process, then explain it.
The platform analogy is useful here. A consumer app can give away a feature for free because the cost sits somewhere else—acquisition, retention, or a future upsell. Mold shops do the same thing without saying so. A low headline price may exclude electrode consumption, texture etching, or two extra trial rounds; a "free" DFM review may be priced into the tooling. As a mold engineer, I'd rather see a quote broken into steel, standard components, machining, EDM, heat treatment, assembly and trial, and a clearly labeled contingency. That structure lets the customer compare apples to apples and lets you defend a change order when the part geometry shifts after kickoff. If a line item can't be explained, it shouldn't be in the quote.
The practical takeaway: build your quotes from process routing, not from a target price. Track actual hours against quoted hours on every tool, and after three or four projects you'll know your real contingency rate—often 8–15% on complex cores. Price the risk you actually carry, disclose what's excluded, and the "hidden account" stops being hidden. For more mold sourcing and quoting references, visit MoldSo at www.moldso.com.
We got burned on hidden line items last year quoting a family tool for a Tier 1 here in Texas. The number I missed was the tryout and spotting allowance—nothing in the line items, then two weeks of benching on our dime. How do you usually see that broken out, per trial or lumped into the tool build? Trying to structure our RFQs so suppliers can't bury it.