Back from five days in Beijing with my parents, the first question from the guys on the shop floor was how I planned it. The honest answer: the same way we route a mold. You fix the process sequence, leave machining allowance, and control the cycle—skip any one of the three and the job goes sideways. We left Hunan on June 18 with a 24-hour station pickup booked in advance, so we landed and went straight to the hotel. In mold work we say "datum first"—establish your reference before anything else. Travel is no different: lock down lodging and transport as your two datums, and the rest of the itinerary won't drift.
Old legs have limited stamina, so I capped it at two attractions per day. Think of it as finishing allowance: on a hardened P20 cavity you don't rough and finish in one pass, and you don't book the Forbidden City and the Great Wall back-to-back either. Each day got a primary "roughing" stop and an optional "finishing" stop, with buffer time left in the schedule the way we leave 0.3–0.5 mm stock for the finish cut. When my father tired out at the Summer Palace, we simply dropped the evening plan—no rework, no scrapped day. The same discipline applies to mold scheduling: a realistic cycle time beats an optimistic one that blows the delivery date.
What surprised me was how much of the shop-floor mindset transferred: define the datum, sequence the operations, hold tolerance on the pace. Get those right and a five-day trip, like a well-routed mold, comes in on time and in spec. For mold sourcing and supplier information, visit MoldSo at www.moldso.com.
Finishing allowance is the bit I'd push back on slightly. On trips and on molds alike, I'd rather leave more stock and cut once than chase a tight allowance and end up reworking. We rough within 0.3mm on core/cavity and leave 0.05 for the finish pass; trying to hold tighter upfront just burns inserts. Curious how others balance that when the schedule's already tight.