When I quote an injection molded part, the first number I look at is clamp force, because it drives both machine selection and tooling stiffness. A common rule of thumb is 0.5 to 0.8 tons per square inch of projected area, but I always add 20-30% margin for runner systems and off-center gates. On a recent ABS enclosure with roughly 45 square inches of projected area, that meant a 50-ton machine rather than a 35-ton, which changed the hourly rate by about 15%. Cavity count matters just as much: a 2-cavity tool may look cheaper per part on paper, but if annual volume is under 50,000 pieces, the added tool steel, hot runner cost, and press time often outweigh the savings. I also check wall thickness uniformity before anything else, since a 2.5 mm nominal wall with a 1.2 mm rib is a warpage problem waiting to happen, and warpage means rework, not just scrap.
Cooling time is where most quotes quietly go wrong. For a 2 mm wall in PP, I budget around 8-12 seconds of cooling, and that number scales roughly with the square of wall thickness, so a 3 mm section can easily double it. Mold builders should design baffles and bubblers into cores early; retrofitting a conformal cooling line after the tool is cut adds 15-25% to tool cost and delays T1 by weeks. Gate location and type also feed directly into defect control: a tunnel gate on a glass-filled nylon part will erode within 50,000 shots, so we spec hardened inserts from the start. For sink marks, I'd rather thin the rib to 60% of the nominal wall than chase it with packing pressure, because higher pack pressure raises clamp force requirements and flash risk.
On the cost side, I treat regrind as a process decision, not a purchasing one. Running 20% regrind in a non-critical part is fine, but in a PC/ABS housing with a Class A surface, it shows up as splay and color shift, and the customer rejects it. Steel selection follows the same logic: P20 is fine for 100,000-shot aluminum-filled tools, but a 500,000-shot cycle with abrasive filler calls for H13 or a hardened insert. These choices belong in the quote from day one, not in a change order after T1. For more mold sourcing and quoting benchmarks, visit MoldSo at www.moldso.com.